Skip to main content
 This program is no longer active, however there are other versions of this program in which you may be interested.

California Efficient Yields: Trust But Verify: Commissioning CEA Buildings and Systems, 10/26/2023, On Demand More info »
Webinar

California Efficient Yields: Trust But Verify: Commissioning CEA Buildings and Systems


Average Rating:
Not yet rated
Duration:
1.5 hours
License:
Never expires.

Dates


Description

The need to generate immediate revenue, along with the excitement of activating a new facility or system upgrade too often leads to rushing the crucial step of commissioning. In doing so, maximum efficiency and lifespan of equipment will not be met, at best, and at worst, crop failures may occur. A panel of experts will advise on how you can develop a tiered plan for commissioning that begins early in the design phase and is paced appropriately through to post-construction. Maintain an effective working relationship with contractors while ensuring the construction and installation of equipment has been done properly. Understand how to commission equipment that is integrated together, such as lighting, HVAC and irrigation with a centralized climate controller. Learn methods to test climate control systems before and after plants are cultivated. Optimize warranty periods and understand the roles of each person on the design team in ensuring peak performance.

Target audience:

  • Cultivators

  • Operations & Facility Staff

  • Design & Construction Partners

  • Property Owners

  • Utility & Government Representatives

Add to your calendar with

Funded with support from: